摘要 |
<p>To reduce the construction period in which a passenger conveyor and a building are built, a passenger conveyor unit formed by incorporating footsteps and an alighting floor in at least a main frame is cured, and the resultant product is inserted from an opening in the ceiling of the building being constructed and installed in the same, and a passenger unit is utilized as a stairway for construction work.</p> |